Use Case
To show how our system automates and optimises the energy and FCAS bids for a scheduled battery using real time (historical) data. The vAdvisor System can equally automate the bids for portfolios limited to FCAS bids, portfolios including both energy and FCAS, renewable plant and embedded batteries and other generation and load facilities.
Procedure
The deliverables of this app are to show:
Dispatch instructions demonstrated using binary bids. In the live system, for a scheduled facility these binary bids would be expanded to fill ten pricebands. For an embedded facility these binary bids represent the instructions sent directly to the facility controller.
Actual settlements including a breakdown of revenue and costs. Aggregated settlements.
Actual dispatch (state of charge) profile.
Forecast state of charge profile for the predispatch time horizon, updated every five minutes.
Expected result
That the value generated by the Facility is more than the value calculated manually (by you). That the forecast and actual (modelled) Facility state is within physical limits. These results show that our vAdvisor Concept is better at dispatching a battery
Constraints: The following are provided as an effective rule set for producing the deliverable:
Bids are to be determined only by contemporary market information as would be the case in operation (i.e. Pre-dispatch). Specifically, this is not to be based on perfect foresight of market outcomes
Settlement is to be consistent with the basic NEMDE trapezium and co-optimisation principals as they apply to plant bids (not with regard to the broader market)
Settlement to be applied on 5-minute basis
Dispatch to be consistent with physical constraints of plant (Energy/SOC, rated power, round trip efficiency), and market constraints (linear energy target ramp, FCAS Contingency registered capacity)
Account to be taken of plant throughoutcycle cost
Energy market prices to be considered non-elastic
FCAS market prices to be elastic
FCAS bid volume to be capped
FCAS prices to reference VIC1 node and apply multiplier schedule
FCAS regulation utilisation to be 25%
Other assumptions supplied by the Client.
Assumptions
The assumptions page allows the user to save any set of assumptions that can be used as inputs into the solve cycle. The user may also inspect the assumptions or edit them for any given set
Solver
The Solver page allows the user to select a given set of assumptions and to select a date range. The no of scenarios is set to one and cannot be changed. A scenario referes to a price scenario and the app requires only the current predispatch price to be selected.
Progress
The Progress page shows the progress of each solve by calculating the expected number of intervals and matching against solved intervals, calculated based on the passed date interval for the solve.
Results
The results page allows the user to inspect the following either in graph mode or table mode.
Aggregated actual daily revenue breakdown
Five minute actual revenue breakdown
Five minute actual physical dispatch and SOC
Five minute actual bids. Note that only the next immediate bid is published.
Forecast profile of SOC published every five minutes - only the forecast SOC shows a complete profile for each 5 minute solve.